Six efforts in dependency order. Each unlocks the next. Locked Thu 19 Mar 2026.
Build the four display views as responsive HTML — desktop, iPad, iPhone. Kurt can't govern what he can't see.
Build a high-conviction queue of autonomous Sonnet sessions for the weekend. Family time — sessions must be fully specified before end of day Thursday.
Lock down the pushback gradient — the system's own immune system for challenging its decisions. Gate 1 property: the hosting plan gets designed with the challenge mechanism already baked in.
Migrate Athena to AWS. GitHub Actions CI/CD, Lambda/ECS, EventBridge scheduling, CloudWatch monitoring. Does NOT block views.
Google Calendar API access as first operational capability. BullMQ/Redis architecture, two-switch model, three-channel notifications.
Gate 3 optimization (faster input/output). Doesn't unlock any Gate 2 capability. Dispatch just launched — tooling immature.
| Name | Status | Mission | What It Knows About |
|---|---|---|---|
| Archimedes | Operational | Conventions hub — what and how | Standards, session protocol, naming, Touchstone, design principles, Map Ops |
| Marvin | Pre-op | Operational hub — when and routing | Calendar (22 cals, 5-person family), scheduling, project management, orchestration |
| Dobby | Pre-op | Physical world expert — what and where | 4 homes, 4 cars, maintenance, repairs, improvements, durable inventory, spaces |
| Cato | Pre-op | Planning domain — judgment + precision | Northslope plan quality (22 people, 9-part template). Extends to The Forge. |
| Argus (proposed) | Proposed | Proactive protection of Athena | Gate 1 enforcement, informed decision-making, security posture |
| Hypatia (proposed) | Proposed | Research in service of protection | Tip of the spear — research → Argus → Athena. Gate 1 chain. |